Withdrawn
Rue de la Fusée 100
Bruxelles · 04/IPETMP/649331 · Permis d'environnement temporaire
Rue de la Fusée 100, Bruxelles: operation of installations. Case annulé, lodged on 24 August 2017. The decision was notified on 8 November 2017, 76 days after lodging.
chantier amiante| Permit type | Permis d'environnement temporaire | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 24 August 2017 | date the file was received |
| Decision notified | 8 November 2017 | 76 days |
| Works started | 27 November 2017 | |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Declared incomplete
- Declared complete
- Decision notified · Withdrawn
- Works started
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 44 m | New construction | Etendre des bâtiments et ajouter un nouveau bâtiment | 2023 |
| 44 m | New construction | agrandir la structure existante de l'entreprise avec une nouvelle aile industrielle (519m²), construire un nouveau bâtim | 2023 |
| 44 m | New construction | agrandir la structure existante de l'entreprise avec une nouvelle aile industrielle, construire un nouveau bâtiment avec | 2023 |
| 90 m | Change of use | Réaffecter l'entrée principale et une partie du 1er étage du bloc A, d'activité productive de biens matériels (data cent | 2022 |
| 178 m | Public space | Créer une zone de remisage tram nocturne par la sécurisation du terminus existant « Eurocontrol » | 2024 |
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)