AltUrb
Granted

Quai des Usines 22–24

Bruxelles · 04/PFD/1987235 · Permis d'urbanisme délivré par le FD

Quai des Usines 22–24, Bruxelles: new construction. Case octroyé, lodged on 19 May 2025. The decision was notified on 2 February 2026, 259 days after lodging.

Construire un nouveau local cabine haute tension sur le site MaBru
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typePermis d'urbanisme délivré par le FD
StatusOctroyé
Lodged on19 May 2025date the file was received
Public inquiry13 November 2025 – 28 November 2025
Consultation committee9 December 2025
Decision notified2 February 2026259 days
Floor areasnot reported by the source
Competent authorityBUP

Timeline

  1. Application lodged
  2. Declared incomplete
  3. Declared complete
  4. Public inquiry opened
  5. Public inquiry closed
  6. Consultation committee
  7. Decision notified · Granted

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
0 mNew constructionConstruction un nouveau local cabine haute tension sur le site MaBru2025
1 mExtension or raisingconstruire une extension de 493 m² comprenant un magasin (commerce de gros) au rez-de-chaussée et des bureaux (accessoir2023
1 mChange of useaménager la mezzanine du Hall E et une partie du Hall D en espace polyvalent pour événements 2022
1 mChange of useaménager la mezzanine du Hall E et une partie du Hall D en espace polyvalent pour événements2022
1 mSigns and advertisingrenouveler le PU U1352/2016 pour le maintien sur terrains non-bâtis, de deux dispositifs publicitaires monopied double-f2022

Other nearby cases : 04/PU/1864371, 04/PU/1908267, 04/PU/1917423, 04/PFD/1910014, 04/PFD/1825881, 04/PU/1859261

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)