Quai de Heembeek 9, Bruxelles: energy works. Case octroyé, lodged on 20 January 2026. The decision was notified on 19 June 2026, 150 days after lodging.

Installer une pompe à chaleur au sol
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typePermis d'urbanisme délivré par le FD
StatusOctroyé
Lodged on20 January 2026date the file was received
Decision notified19 June 2026150 days
Works started22 June 2026
Floor areasnot reported by the source
Competent authorityBUP

Timeline

  1. Application lodged
  2. Declared incomplete
  3. Declared complete
  4. Decision notified · Granted
  5. Works started

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
71 mNew constructionplacer un local prefab et installer une terras en bois2023
234 mNew constructionConstruire un nouveau projet mixte immobilier et paysager comprenant : - une école secondaire d'une capacité d'accueil d2023
236 mPublic spaceCréer un passage cyclo-piéton et réaménager l’espace public au débouché de celui-ci le long de la rive gauche du canal, 2021
245 mDemolition and reconstructionDémolir 2 hangars existants pour reconstruire un magasin de vente de matériaux avec un espace d'entreposage à l'étage ai2023

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)