Granted
Quai de Heembeek 9
Bruxelles · 04/PFD/2017216 · Permis d'urbanisme délivré par le FD
Quai de Heembeek 9, Bruxelles: energy works. Case octroyé, lodged on 20 January 2026. The decision was notified on 19 June 2026, 150 days after lodging.
Installer une pompe à chaleur au sol| Permit type | Permis d'urbanisme délivré par le FD | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 20 January 2026 | date the file was received |
| Decision notified | 19 June 2026 | 150 days |
| Works started | 22 June 2026 | |
| Floor areas | — | not reported by the source |
| Competent authority | BUP |
Timeline
- Application lodged
- Declared incomplete
- Declared complete
- Decision notified · Granted
- Works started
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 71 m | New construction | placer un local prefab et installer une terras en bois | 2023 |
| 234 m | New construction | Construire un nouveau projet mixte immobilier et paysager comprenant : - une école secondaire d'une capacité d'accueil d | 2023 |
| 236 m | Public space | Créer un passage cyclo-piéton et réaménager l’espace public au débouché de celui-ci le long de la rive gauche du canal, | 2021 |
| 245 m | Demolition and reconstruction | Démolir 2 hangars existants pour reconstruire un magasin de vente de matériaux avec un espace d'entreposage à l'étage ai | 2023 |
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)