Avenue de la Force Aérienne 10
Etterbeek · 05/IPEEXT/446920 · Extension / Transformation de PE
Avenue de la Force Aérienne 10, Etterbeek: operation of installations. Case annulé, lodged on 13 September 2005. The decision was notified on 13 October 2005, 30 days after lodging.
verhuis werkplaatsen voor houtbewerking, opslagplaats voor hout, en andere materialen, ontvlambare vloeistoffen, werkplaats voor thermische bewerking van metalen en voor metaalbewerking| Permit type | Extension / Transformation de PE | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 13 September 2005 | date the file was received |
| Decision notified | 13 October 2005 | 30 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Withdrawn
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 51 m | Façade and windows | Modifier le permis d’urbanisme portant la référence régionale 05/PFD/1693445 et délivré le 2020-02-19 au niveau du parem | 2023 |
| 166 m | Demolition and reconstruction | démolir les bâtiments existants et construire un immeuble R+3 comportant 11 logements et un parking de 11 emplacements | 2022 |
| 213 m | Façade and windows | installer des stores de protection solaire motorisés sur l'ensemble des baies vitrées de la façade avant d'une maison un | 2026 |
| 215 m | Extension or raising | régulariser les modifications apportées (châssis, aménagements intérieurs, annexe au rez et terrasse au 1er), construire | 2024 |
| 216 m | Tree felling | Abattre l'érable qui se trouve dans la cour-jardin de la maison à proximité de la limite parcellaire. | 2024 |