Skip to content
Altaica Urban
Granted

Avenue du Four à Briques 5

Evere · 06/IPEPLP/1944071 · Prolongation de PE

Avenue du Four à Briques 5, Evere: operation of installations. Case octroyé, lodged on 15 May 2024. The decision was notified on 29 April 2025, 349 days after lodging.

uitbating van een drukkerij en magazijn
The application's own description, in its source language (NL). Source: Nova.
Key figures
Permit typeProlongation de PE
StatusOctroyé
Lodged on15 May 2024date the file was received
Decision notified29 April 2025349 days
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Declared incomplete
  3. Declared complete
  4. Decision notified · Granted

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
119 mNew constructionConstruire une salle de sport (avec vestiaires, rangement et toitettes) et des locaux (5 salles de classes, 2 laboratioi2025
119 mNew constructionConstruire une salle de sport (avec vestiaires, rangement et toilettes) et des locaux (5 salles de classes, 2 laboratoir2025
182 mPublic spaceAménager la Promenade Verte le long de la rue de l’Arbre unique, modifier le profil de la voirie, aménager les chemins c2022
182 mSigns and advertisingPlacer 4 enseignes parallèles _ SANS SUITE2026
182 mSigns and advertisingPlacer 4 enseignes parallèles2026

Other nearby cases : 06/PFD/2024480, 06/PFD/2016768, 06/PU/1912570

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)