Skip to content
Altaica Urban
Pending

Avenue Notre-Dame 40

Evere · 06/PFD/91716-01 · Permis d'urbanisme délivré par le FD

Avenue Notre-Dame 40, Evere: demolition and reconstruction. Case demandé, lodged on 3 August 1995.

démolir l'ensemble du pavillon 6 (Ossatub) de l'école Clair-Vivre et construction de 2 locaux de classes
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typePermis d'urbanisme délivré par le FD
StatusDemandé
Lodged on3 August 1995date the file was received
Floor areasnot reported by the source
Competent authorityBUP

Timeline

  1. Application lodged

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
1 mPublic spaceInstaller des abris sécurisés pour vélos (6 électriques- 15 standards) dans le perimètre de l'école Clair Vivre.2022
1 mDemolition and reconstructionDémolir et construire un nouveau pavillon sanitaire sous un auvent existant pour l' école élémentaire Clair-Vivre.2024
1 mPublic spaceInstaller des abris sécurisés pour vélos ( 6 électriques-15 standards) dans le périmètre de l’école Clair Vivre2022
50 mExtension or raisingmettre en conformité les travaux effectués (augmentation du nombre de logements, extension, aspect de la façade)2025
73 mHeavy renovationmettre en conformité les transformations apportées à un appartement.2023

Other nearby cases : 06/PU/2044723, 06/PU/2044284, 06/PU/1827425, 06/SFD/1820175, 06/PU/1970715, 06/PU/1831688, 06/PU/1865659, 06/PFD/1836728, 06/PFD/1972503, 06/PU/1839961, 06/PU/1842649, 06/PU/1966067, 06/PU/1971251, 06/PU/1946417, 15/PU/2022210, 06/PU/1896534, 06/PU/1946888, 06/PU/1847246, 06/PU/1848865, 06/PU/1935694, 06/PU/1897574, 06/PU/1932827, 06/PU/2017003, 06/SFD/1868825, 06/PU/1825087

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)