Skip to content
Altaica Urban
Granted

Boulevard de la deuxième armée britannique 201

Forest · 07/CL3/1743495 · Déclaration préalable Communal

Boulevard de la deuxième armée britannique 201, Forest: operation of installations. Case octroyé, lodged on 4 March 2020.

Inrichting van een verbouwingwerf met een drijfkracht van 390 kW. Rubriek: 28 1
The application's own description, in its source language (NL). Source: Nova.
Key figures
Permit typeDéclaration préalable Communal
StatusOctroyé
Lodged on4 March 2020date the file was received
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Declared complete

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
99 mFaçade and windowsInstaller une plate-forme métallique contre la façade du hall R12022
154 mExtension or raisingHet uitbreiden van 2 fietsenstallingen2024
216 mTree fellingAbattre le frêne commun (ID: 5355) au sein du parc de l'Abbaye de Forest pour lequel des études complémentaires ont été 2024
227 mOtherPlacer des infrastructures dans le cadre de la 5ème édition du festival "Ô Tour des Contes" sur le site de l'Abbaye de F2025
241 mOtherPlacer des infrastructures dans le cadre de la 6ème édition du festival "Ô Tour des Contes" au sein du site de l'Abbaye 2026

Other nearby cases : 07/PFU/1990586, 07/PFU/2032043, 07/PFU/2037537, 07/PFU/1911048

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)