Skip to content
AltUrb
Withdrawn

Boulevard de l'Humanité 292

Forest · 07/IPE/434959 · Permis d'environnement

Boulevard de l'Humanité 292, Forest: operation of installations. Case annulé, lodged on 19 June 2001. The decision was notified on 25 April 2003, 675 days after lodging.

régularisation de pe pour un parking à l'air libre
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typePermis d'environnement
StatusAnnulé
Lodged on19 June 2001date the file was received
Public inquiry17 February 2003 – 18 February 2003
Consultation committee13 March 2003
Decision notified25 April 2003675 days
Floor areasnot applicable to this type of case
Impact studyyes

Timeline

  1. Application lodged
  2. Declared complete
  3. Public inquiry opened
  4. Public inquiry closed
  5. Consultation committee
  6. Decision notified · Withdrawn

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
1 mOtherRéaménager des emplacements de parking extérieur2022
150 mDemolition and reconstructionDémolir et reconstruire des bâtiments d'entrepôts logistiques, modifications des circulations, avec un parking couvert 2022
180 mFaçade and windowsmettre en conformité les modifications de baies, de circulation extérieure, la modification du parking couvert passant d2024
192 mNew constructionConstruire et exploiter une grande éolienne et ses accessoires dans le cadre de la production d'énergie verte, installer2024

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)