Granted
Boulevard de la Deuxième Armée Britannique 600
Forest · 07/IPE/559777 · Permis d'environnement
Boulevard de la Deuxième Armée Britannique 600, Forest: operation of installations. Case octroyé, lodged on 4 March 2015. The decision was notified on 9 October 2015, 219 days after lodging.
Dépôt de matériaux divers| Permit type | Permis d'environnement | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 4 March 2015 | date the file was received |
| Decision notified | 9 October 2015 | 219 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Declared incomplete
- Declared complete
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 73 m | Public space | Construire un nouveau stade pour la Royale Union Saint-Gilloise et aménager les abords des espaces publics en connexion | 2025 |
| 91 m | Signs and advertising | Mettre en conformité le placement d'un dispositif publicitaire sur pieds, double-face statique, de 14.57m², non-éclairé | 2026 |
| 97 m | Energy works | Isoler l'enveloppe du bâtiment. Remplacer les installations HVAC, poser des panneaux solaires et réaménager les abords | 2024 |
| 132 m | Extension or raising | modifier les façades du bâtiment et construire des volumes (cabine haute tension, parking vélo, cheminée, groupe de froi | 2024 |
| 164 m | Demolition and reconstruction | construire un local vélo et une cabine à haute tension, installer 2 citernes d'eau de pluie d'une capacité totale de 200 | 2025 |
Other nearby cases : 07/PU/1991417, 07/PFU/1923975, 07/PU/1800505, 07/PU/1835233, 07/PFD/2003879, 07/PFD/1917033, 07/PFD/1860383
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)