Withdrawn
Chaussée de Ruisbroek 209
Forest · 07/IPEEXT/1798325 · Extension / Transformation de PE
Chaussée de Ruisbroek 209, Forest: operation of installations. Case annulé, lodged on 1 September 2021. The decision was notified on 1 October 2021, 30 days after lodging.
Abandon du projet de construction du « bâtiment A » et déplacement des dépôts de liquides inflammables (rub. 88-1B et 88-2C) et du dépôt de produits dangereux (rub.121C) vers le bâtiment « Graceffa » + suppression du groupe de froid prévu dans le futur bâtiment A| Permit type | Extension / Transformation de PE | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 1 September 2021 | date the file was received |
| Decision notified | 1 October 2021 | 30 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Withdrawn
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 10 m | Extension or raising | Implanter une cabine haute tension, agrandir un local technique existant et installer 2 réservoirs de stockage et instal | 2024 |
| 176 m | New construction | Construction d'un immeuble administratif (bureaux) et un hall d'assemblage. | 2021 |
| 176 m | New construction | Construction d'un immeuble d'activité productive artisanale avec bureaux accessoires. | 2022 |
| 192 m | Retail or horeca fit-out | aménager un show-room au niveau du parking | 2022 |
| 195 m | Signs and advertising | installer une enseigne lumineuse | 2026 |
Other nearby cases : 07/PU/1991417, 07/PFD/1924716
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)