Withdrawn
Boulevard de l'Humanité 292
Forest · 07/IPEEXT/1855348 · Extension / Transformation de PE
Boulevard de l'Humanité 292, Forest: operation of installations. Case annulé, lodged on 16 September 2022. The decision was notified on 13 October 2022, 27 days after lodging.
diminution de 123 d’emplacements de parkings (282 à 159) par rapport au permis d’environnement n° 633387, augmentation de 29 emplacements de parking (159 à 188) suivant les nouvelles limites de terrain et fusion du permis d’environnement communal n°1789901 et du permis d’environnement n°633387
| Permit type | Extension / Transformation de PE | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 16 September 2022 | date the file was received |
| Decision notified | 13 October 2022 | 27 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Withdrawn
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 1 m | Other | Réaménager des emplacements de parking extérieur | 2022 |
| 150 m | Demolition and reconstruction | Démolir et reconstruire des bâtiments d'entrepôts logistiques, modifications des circulations, avec un parking couvert | 2022 |
| 180 m | Façade and windows | mettre en conformité les modifications de baies, de circulation extérieure, la modification du parking couvert passant d | 2024 |
| 192 m | New construction | Construire et exploiter une grande éolienne et ses accessoires dans le cadre de la production d'énergie verte, installer | 2024 |
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)