Skip to content
Altaica Urban
Withdrawn

Boulevard de l'Humanité 292

Forest · 07/IPEEXT/446789 · Extension / Transformation de PE

Boulevard de l'Humanité 292, Forest: operation of installations. Case annulé, lodged on 23 August 2005.

Renouvellement de l'installation de dépoussiérage pour mise en conformité (augmentation seuil rub 54b)
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typeExtension / Transformation de PE
StatusAnnulé
Lodged on23 August 2005date the file was received
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
1 mOtherRéaménager des emplacements de parking extérieur2022
150 mDemolition and reconstructionDémolir et reconstruire des bâtiments d'entrepôts logistiques, modifications des circulations, avec un parking couvert 2022
180 mFaçade and windowsmettre en conformité les modifications de baies, de circulation extérieure, la modification du parking couvert passant d2024
192 mNew constructionConstruire et exploiter une grande éolienne et ses accessoires dans le cadre de la production d'énergie verte, installer2024

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)