Withdrawn
Boulevard de l'Humanité 124
Forest · 07/IPEEXT/458621 · Extension / Transformation de PE
Boulevard de l'Humanité 124, Forest: extension or raising. Case annulé, lodged on 26 May 2011. The decision was notified on 28 June 2011, 33 days after lodging.
Demande de modification de permis ayant pour objet: la réparation de la dalle betonnée à l'entrée du site, un léger agrandissement de cette entrée, la réalisation d'un nouvel égouttage à l'entrée du site et l'aménagement du parking intérieur sans augmentation de capacité.| Permit type | Extension / Transformation de PE | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 26 May 2011 | date the file was received |
| Decision notified | 28 June 2011 | 33 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Withdrawn
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 83 m | Signs and advertising | Installer un dispositif publicitaire digital de 2 m² (MU783) à hauteur du n°122 boulevard Industriel | 2023 |
| 88 m | Signs and advertising | Maintenir un panneau publicitaire non éclairé de 20 m², situé sur un talus à proximité du boulevard Industriel 116. | 2024 |
| 186 m | Signs and advertising | maintenir un dispositif publicitaire de 15m² | 2025 |
| 192 m | Change of use | changer l'affectation d'un centre de véhicules d'occasion en entrepôt avec show-room | 2023 |
| 211 m | Signs and advertising | maintenir un dispoisitif publicitaire de 36 m² | 2025 |
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)