Withdrawn
Rue de Lusambo 55
Forest · 07/IPEEXT/477332 · Extension / Transformation de PE
Rue de Lusambo 55, Forest: operation of installations. Case annulé, lodged on 8 October 2012. The decision was notified on 6 November 2012, 29 days after lodging.
Demande de régularisation d'un dépôt de bois de 400m², d'un compresseur d'air de 2.2kW, d'un dépôt de gaz de 1500l, d'un dépôt de produits dangereux et de 15 emplacements de parking.| Permit type | Extension / Transformation de PE | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 8 October 2012 | date the file was received |
| Decision notified | 6 November 2012 | 29 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Withdrawn
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 0 m | Energy works | Isoler l'enveloppe du bâtiment. Remplacer les installations HVAC, poser des panneaux solaires et réaménager les abords | 2024 |
| 50 m | Extension or raising | modifier les façades du bâtiment et construire des volumes (cabine haute tension, parking vélo, cheminée, groupe de froi | 2024 |
| 109 m | Demolition and reconstruction | construire un local vélo et une cabine à haute tension, installer 2 citernes d'eau de pluie d'une capacité totale de 200 | 2025 |
| 128 m | Public space | Construire un nouveau stade pour la Royale Union Saint-Gilloise et aménager les abords des espaces publics en connexion | 2025 |
| 157 m | Change of use | Régularisation les modifications de la salle 1 suite au permis 07/PFD/619741 (d.d. 31/07/2017) Changer l'affectation de | 2023 |
Other nearby cases : 07/PFD/1860383, 07/PFD/2003879, 07/PU/1991417, 07/PU/2016301, 07/PU/1800505, 07/PU/1835233, 07/PFU/1923975, 07/PU/2024902, 07/PFD/2026786