Withdrawn
Boulevard de l'Humanité 124
Forest · 07/IPEEXT/494350 · Extension / Transformation de PE
Boulevard de l'Humanité 124, Forest: operation of installations. Case annulé, lodged on 18 November 2013. The decision was notified on 5 December 2013, 17 days after lodging.
ajustement du seuil de certaines rubriques (45A, 45B, 80A), ajout des rubriques 19A,45C et 94A. Suppression de la rubrique 48B, signalement de la rpésence d'un poste de soudage ainsi que demande de réduire la capacité de la citerne de rétention d'eau pluviales à 15m³.| Permit type | Extension / Transformation de PE | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 18 November 2013 | date the file was received |
| Decision notified | 5 December 2013 | 17 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Withdrawn
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 83 m | Signs and advertising | Installer un dispositif publicitaire digital de 2 m² (MU783) à hauteur du n°122 boulevard Industriel | 2023 |
| 88 m | Signs and advertising | Maintenir un panneau publicitaire non éclairé de 20 m², situé sur un talus à proximité du boulevard Industriel 116. | 2024 |
| 186 m | Signs and advertising | maintenir un dispositif publicitaire de 15m² | 2025 |
| 192 m | Change of use | changer l'affectation d'un centre de véhicules d'occasion en entrepôt avec show-room | 2023 |
| 211 m | Signs and advertising | maintenir un dispoisitif publicitaire de 36 m² | 2025 |
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)