Withdrawn
Chaussée de Ruisbroek 127
Forest · 07/IPEEXT/559984 · Extension / Transformation de PE
Chaussée de Ruisbroek 127, Forest: operation of installations. Case annulé, lodged on 6 March 2015. The decision was notified on 30 March 2015, 24 days after lodging.
Ajout d’une cabine haute tension de 250 kVA,
Stockage de déchets dangereux et non dangereux au niveau du parking à ciel ouvert et nouveaux flux de déchets,
Augmentation du nombre de véhicules du parc de stationnement à l’air libre
| Permit type | Extension / Transformation de PE | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 6 March 2015 | date the file was received |
| Decision notified | 30 March 2015 | 24 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Withdrawn
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 40 m | Extension or raising | Implanter une cabine haute tension, agrandir un local technique existant et installer 2 réservoirs de stockage et instal | 2024 |
| 137 m | New construction | Construction d'un immeuble administratif (bureaux) et un hall d'assemblage. | 2021 |
| 137 m | New construction | Construction d'un immeuble d'activité productive artisanale avec bureaux accessoires. | 2022 |
| 145 m | Retail or horeca fit-out | aménager un show-room au niveau du parking | 2022 |
| 166 m | Signs and advertising | installer une enseigne lumineuse | 2026 |
Other nearby cases : 07/PU/1991417, 07/PU/2009562, 07/PFD/1917033, 07/PFD/1860383
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)
