Granted
Boulevard de l'Humanité 124
Forest · 07/IPEPLP/1767072 · Prolongation de PE
Boulevard de l'Humanité 124, Forest: operation of installations. Case octroyé, lodged on 23 November 2020. The decision was notified on 25 May 2022, 548 days after lodging.
Centre de tri de déchets non dangereux et parc à conteneurs| Permit type | Prolongation de PE | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 23 November 2020 | date the file was received |
| Decision notified | 25 May 2022 | 548 days |
| Works started | 28 May 2022 | |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Declared incomplete
- Declared complete
- Decision notified · Granted
- Works started
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 83 m | Signs and advertising | Installer un dispositif publicitaire digital de 2 m² (MU783) à hauteur du n°122 boulevard Industriel | 2023 |
| 88 m | Signs and advertising | Maintenir un panneau publicitaire non éclairé de 20 m², situé sur un talus à proximité du boulevard Industriel 116. | 2024 |
| 186 m | Signs and advertising | maintenir un dispositif publicitaire de 15m² | 2025 |
| 192 m | Change of use | changer l'affectation d'un centre de véhicules d'occasion en entrepôt avec show-room | 2023 |
| 211 m | Signs and advertising | maintenir un dispoisitif publicitaire de 36 m² | 2025 |
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)