Withdrawn
Boulevard de l'Humanité 292
Forest · 07/IPEPLP/599707 · Prolongation de PE
Boulevard de l'Humanité 292, Forest: operation of installations. Case annulé, lodged on 29 April 2016. The decision was notified on 28 April 2017, 364 days after lodging.
Prolongation de l’exploitation de l’usine de production de sachets de thé LIPTON| Permit type | Prolongation de PE | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 29 April 2016 | date the file was received |
| Decision notified | 28 April 2017 | 364 days |
| Works started | 2 May 2017 | |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Declared incomplete
- Declared complete
- Decision notified · Withdrawn
- Works started
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 1 m | Other | Réaménager des emplacements de parking extérieur | 2022 |
| 150 m | Demolition and reconstruction | Démolir et reconstruire des bâtiments d'entrepôts logistiques, modifications des circulations, avec un parking couvert | 2022 |
| 180 m | Façade and windows | mettre en conformité les modifications de baies, de circulation extérieure, la modification du parking couvert passant d | 2024 |
| 192 m | New construction | Construire et exploiter une grande éolienne et ses accessoires dans le cadre de la production d'énergie verte, installer | 2024 |
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)