Granted
Boulevard de l'Humanité 292
Forest · 07/IPEPLP/635010 · Prolongation de PE
Boulevard de l'Humanité 292, Forest: operation of installations. Case octroyé, lodged on 12 April 2017. The decision was notified on 19 March 2018, 341 days after lodging.
Demande de prolongation de permis pour un parking à l’air libre de 200 véhicules.| Permit type | Prolongation de PE | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 12 April 2017 | date the file was received |
| Decision notified | 19 March 2018 | 341 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Declared incomplete
- Declared complete
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 1 m | Other | Réaménager des emplacements de parking extérieur | 2022 |
| 150 m | Demolition and reconstruction | Démolir et reconstruire des bâtiments d'entrepôts logistiques, modifications des circulations, avec un parking couvert | 2022 |
| 180 m | Façade and windows | mettre en conformité les modifications de baies, de circulation extérieure, la modification du parking couvert passant d | 2024 |
| 192 m | New construction | Construire et exploiter une grande éolienne et ses accessoires dans le cadre de la production d'énergie verte, installer | 2024 |
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)