Skip to content
AltUrb
Withdrawn

Boulevard de la Plaine 2

Ixelles · 09/IPEEXT/480859 · Extension / Transformation de PE

Boulevard de la Plaine 2, Ixelles: operation of installations. Case annulé, lodged on 20 December 2012. The decision was notified on 10 January 2013, 21 days after lodging.

bijkomende mobiele vaten met vloeibaar stikstof
The application's own description, in its source language (NL). Source: Nova.
Key figures
Permit typeExtension / Transformation de PE
StatusAnnulé
Lodged on20 December 2012date the file was received
Decision notified10 January 201321 days
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Decision notified · Withdrawn

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
0 mOtherDélai défini à défaut d'analyse de la complétude2022
0 mHeavy renovationRestaurer et rénover le bâtiment du rectorat (bâtiment M ou bâtiment Braem) de la VUB concernant les travaux du deuxième2021
162 mNew constructionDe Vrije Universiteit Brussel (VUB) kampt met een groeiend tekort aan onderwijsruimte als gevolg van de aanhoudende toen2025
162 mNew constructionInstaller un auditoire temporaire de type hangar en structure acier et panneaux d'une capacité maximale de +/- 620 étudi2025
167 mOffice conversionTransformer un immeuble de bureaux en un bâtiment multifonctionnel pour 4 utilisateurs : 2 écoles secondaires (700+ 450 2024

Other nearby cases : 09/PFD/1840022, 09/GOU_PU/2028764, 09/PU/2012826, 09/PFD/1852260, 05/GOU_PU/1841302, 05/PP/1823293, 05/PU/1899118, 09/PU/2032412, 09/PFD/1907453, 09/PFD/1905524, 09/GOU_PU/1937162, 09/PFD/2035522, 09/PFD/1925957, 09/PFU/1907998, 05/PFD/1918919, 05/PFD/2018827

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)