Granted
Boulevard du Triomphe
Ixelles · 09/PFD/1858985 · Permis d'urbanisme délivré par le FD
Boulevard du Triomphe, Ixelles: new construction. Case octroyé, lodged on 19 October 2022. The decision was notified on 3 February 2023, 107 days after lodging.
Installer une structure temporaire comprenant un auditorium de 500 places (2 x 250 places), des toilettes et des installations techniques.| Permit type | Permis d'urbanisme délivré par le FD | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 19 October 2022 | date the file was received |
| Decision notified | 3 February 2023 | 107 days |
| Competent authority | BUP |
Timeline
- Application lodged
- Declared complete
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 121 m | Extension or raising | Construction d’un nouvel escalier de secours pour le bâtiment BC aile C, au campus de la Plaine à Ixelles, dans le but d | 2026 |
| 121 m | New construction | Construire un nouvel escalier de secours pour le bâtiment universitaire BC sur le campus de la Plaine | 2026 |
| 181 m | Tree felling | abattre 4 arbres à haute tige: 2 saules blancs (Salix alba), 1 tilleul argenté (Tilia tomentosa), et 1 érable rouge (Ace | 2025 |
| 232 m | Demolition and reconstruction | Démolir la concession automobile existante et construire un projet mixte de logements, commerces de proximité (horeca), | 2026 |
| 244 m | Change of use | Modifier l'affectation d'un immeuble de bureaux (surfaces polyvalentes) en équipement d'intérêt collectif (équipement un | 2025 |
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)