Esplanade de l'Europe
Saint-Gilles · 13/IPE/543194 · Permis d'environnement
Esplanade de l'Europe, Saint-Gilles: —. Case octroyé, lodged on 4 July 2014. The decision was notified on 8 September 2014, 66 days after lodging.
BX-L0-015| Permit type | Permis d'environnement | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 4 July 2014 | date the file was received |
| Decision notified | 8 September 2014 | 66 days |
| Works started | 15 December 2015 | |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Granted
- Works started
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 5 m | Other | placer une installation sculpturale temporaire | 2022 |
| 27 m | Other | placer une installation sculpturale temporaire | 2023 |
| 68 m | Demolition | démolir sans reconstruire l'immeuble pour installer une piscine à ciel ouvert et modifier le relief pour installer un ba | 2023 |
| 93 m | Heavy renovation | modifier les aménagements intérieurs avec travaux structurels, le volume, la façade, le relief du terrain et aménager un | 2025 |
| 93 m | Change of use | modifier la destination d’une partie du rez-de-chaussée et d’une partie du sous-sol de commerce à hôtel, les aménagement | 2024 |
Other nearby cases : 13/PU/1970608, 13/PFD/1997149, 13/PU/1993922, 13/GOU_PU/1957668, 13/PFD/1945863, 13/PFD/2022899, 13/PU/2022738, 13/PU/1934291, 13/GOU_PU/1959148, 13/PU/1908955, 13/PU/1848890, 13/PU/1974134, 13/PU/1825710, 04/PFD/1827956, 13/PU/2009655, 13/GOU_PU/2019004, 13/PU/1994098, 13/PU/1918089, 13/PU/2002424, 13/GOU_PU/1870527, 13/PU/1862035, 13/PU/1950333, 13/PU/1860290, 13/PU/1855126, 01/GOU_PU/1969562