Withdrawn
Tunnel Botanique
Saint-Josse-ten-Noode · 14/IPEDEC/690345 · Déclaration préalable
Tunnel Botanique, Saint-Josse-ten-Noode: operation of installations. Case annulé, lodged on 6 July 2018.
501B5_1&35501B5_1| Permit type | Déclaration préalable | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 6 July 2018 | date the file was received |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Declared incomplete
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)