Boulevard du Roi Albert II 15
Saint-Josse-ten-Noode · 14/IPEPLP/1789740 · Prolongation de PE
Boulevard du Roi Albert II 15, Saint-Josse-ten-Noode: operation of installations. Case octroyé, lodged on 11 June 2021. The decision was notified on 9 June 2022, 363 days after lodging.
Uitbating van een kantoorgebouw
| Permit type | Prolongation de PE | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 11 June 2021 | date the file was received |
| Decision notified | 9 June 2022 | 363 days |
| Works started | 13 June 2022 | |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Declared incomplete
- Declared complete
- Decision notified · Granted
- Works started
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 77 m | Signs and advertising | placer une enseigne lumineuse | 2022 |
| 77 m | Other | installer de nouveaux équipements de télécommunication mobile pour TELENET sur la toiture d’un bâtiment existant | 2026 |
| 89 m | Façade and windows | Modifier l'aspect des façades, revoir les abords et ajouter un plancher dans le local technique situé au niveau -2 d’un | 2024 |
| 118 m | Public space | Relocalisation temporaire des arrêts et zones d’attente des bus De Lijn et STIB pendant la construction du projet NOR (e | 2025 |
| 119 m | Tree felling | abattre 2 arbres | 2024 |
Other nearby cases : 04/PFD/1998434, 14/PU/2013846, 14/PU/2039293, 14/PFD/1968723, 14/PU/1945426, 14/PU/1907944, 14/PU/1849652, 14/PU/2022669, 14/PU/2026583, 04/PFD/1811312, 15/PFD/1848776, 14/PU/1856955, 04/PU/1832245, 04/PFD/1831779, 04/PU/1870717, 14/PFD/1811303, 04/PU/1938480, 04/SFD/1971702, 14/PU/1849743, 14/PFD/1908297, 15/PFD/1961647, 14/PU/1905331, 04/PU/1867723, 04/PU/1829036, 14/PU/1968751
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)