Rue de Stalle 292–292B
Uccle · 16/IPEEXT/457443 · Extension / Transformation de PE
Rue de Stalle 292–292B, Uccle: operation of installations. Case annulé, lodged on 1 October 2010. The decision was notified on 26 October 2010, 25 days after lodging.
Placement d'un système centralisé d'aspiration des poussière de l'atelier de menuiserie et mise en place de dispositifs d'insonorisation| Permit type | Extension / Transformation de PE | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 1 October 2010 | date the file was received |
| Decision notified | 26 October 2010 | 25 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Withdrawn
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 24 m | Public space | Réaménager et étendre le parking de transit 'Stalle' situé entre la rue de Stalle, la rue de l'Etoile et le terminus du | 2022 |
| 59 m | Extension or raising | prolonger une construction temporaire: bâtiment didactique construit en économie circulaire | 2022 |
| 112 m | Public space | Renouveler les voies usées entre le n°2 et le n°184 de la rue de l’Etoile, Mettre aux normes les arrêts « Keyenbempt » e | 2024 |
| 118 m | Extension or raising | mettre en conformité la construction de 30m2 au sous-sol d'une maison unifamiliale | 2025 |
| 123 m | Tree felling | Abattre trois sapins | 2022 |
Other nearby cases : 16/PFD/1856092, 16/PU/1849774, 16/PFD/1906352, 16/PFD/1967683, 16/PFD/1991939, 16/PU/2018723, 16/PU/1842913, 16/PU/1927758, 16/PU/1987745, 16/PU/1994388, 16/PFD/1927239, 16/PU/2023007, 16/PU/2005945, 16/PU/2021275, 16/PU/1848213, 16/PU/1870155, 16/PU/1827089, 16/PU/1963959, 16/PU/1956675, 16/PU/1852130, 16/SFD/1940166, 16/AA/1933289, 16/PU/1835919, 16/PU/1811393, 16/SFD/1843015
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)
