Skip to content
Altaica Urban
Granted

Chaussée de La Hulpe 53A

Uccle · 16/IPEMOD/1746521 · Modification de conditions de PE

Chaussée de La Hulpe 53A, Uccle: operation of installations. Case octroyé, lodged on 2 April 2020.

modification du PE : repousser les délais de transmission des DAP restant de 2 ans
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typeModification de conditions de PE
StatusOctroyé
Lodged on2 April 2020date the file was received
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Declared incomplete

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
0 mOtherInstaller une terrasse et ses annexes techniques pour une duré de 3 mois.2024
0 mOtherOffrir une exposition d'oeuvres d'art outdoor sur le site. Une dizaine d'oeuvres issues de collections privées (Fondati2026
0 mPublic spaceRénover la lice, entretenir la piste de l'ancien hippodrome et poser des bancs temporaires.2022
0 mHeavy renovationInstaller le chantier pour rénover le bloc sanitaires dans le village des Paris et réaliser les travaux intérieurs de la2025
0 mHeavy renovationInstallation chantier pour rénovation 2 bâtiments de l'Hippodrome de Boitsfort2024

Other nearby cases : 16/PFU/1934850, 16/PFU/1851839, 16/PFU/1870713, 16/PFU/1918713, 16/PFU/1987008, 16/PFU/2028508, 16/PFU/1973847, 16/PFU/1997435, 16/PFU/2032267, 16/PFU/1995270, 16/PFU/2019407, 16/PFU/1867760, 16/PFU/1848979, 16/PFU/1854173, 16/PFU/1906057, 16/PFU/1846073, 16/PFU/2019965, 16/PFU/1833910

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)