Boulevard du Souverain 25

Watermael-Boitsfort · 17/IPEEXT/1999945 · Extension / Transformation de PE

Boulevard du Souverain 25, Watermael-Boitsfort: operation of installations. Case octroyé, lodged on 2 September 2025. The decision was notified on 11 September 2025, 9 days after lodging.

modification
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typeExtension / Transformation de PE
StatusOctroyé
Lodged on2 September 2025date the file was received
Decision notified11 September 20259 days
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Decision notified · Granted

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
0 mHeavy renovationCréer un monte-charge entre le niveau sous-sol -2 et le niveau sous-sol -1.2023
0 mChange of useRégulariser l'aménagement extérieur et signalétique, mettre en place de nouveau panneaux de signalisation extérieur, mod2024
0 mChange of useReconvertir et rénover l’ancienne chaufferie de la Royale Belge en vue d’y développer une mixité fonctionnelle (activité2024
0 mChange of useChanger l'affection d'un local "bureau" au sous-sol -2 en local "équipements" et installer un totem en zone de recul2025
2 mPublic spaceConstruire un bassin d'orage sous la voirie de Ten Reuken et du parc Axa avec une capacité de 5.171m³.2022

Other nearby cases : 17/PFU/1811646, 17/PFU/1832024, 17/PFU/1848909, 17/PFU/1998123, 17/PFD/1837671, 17/GOU_PU/1901387, 17/PFU/2040831, 17/PFU/1993476, 17/PFD/1950364, 17/PFD/1929854, 17/PU/1833063, 17/PFU/1846270, 17/PFU/1918639, 17/PU/1922803, 17/PU/2002370, 17/PU/2020003, 17/PFD/2023287, 17/PFD/1938677, 17/PFU/1934277, 17/PFU/1990060, 17/PU/1855207, 17/PU/1996881