Skip to content
Altaica Urban
Granted

Boulevard du Souverain 23–25

Watermael-Boitsfort · 17/IPEMOD/1822727 · Modification de conditions de PE

Boulevard du Souverain 23–25, Watermael-Boitsfort: operation of installations. Case octroyé, lodged on 19 November 2021.

modification conditions incendie, captages, ventilation et mobilité
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typeModification de conditions de PE
StatusOctroyé
Lodged on19 November 2021date the file was received
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
60 mHeavy renovationCréer un monte-charge entre le niveau sous-sol -2 et le niveau sous-sol -1.2023
60 mOtherModifier le permis existant du 04/08/2021 2021
60 mOtherPlacer des équipements intérieurs consistant en des installations décoratives et réversibles.2022
60 mChange of useRégulariser l'aménagement extérieur et signalétique, mettre en place de nouveau panneaux de signalisation extérieur, mod2024
60 mOtherModifier le projet dont le PU a été obtenu le 4 août 2021 (réf : 17/PFU/1769123 et son permis modificatif 17/PFU/18116462022

Other nearby cases : 17/PFU/1839941, 17/PFU/1933141, 17/PFU/1990850, 17/PU/2002370, 17/PFU/1918639, 17/PFU/1846270, 17/PU/1922803, 17/PU/2020003, 17/PFD/2023287, 17/PFU/1993476, 17/PFU/2040831, 17/PFD/1929854, 17/PFU/1998123, 17/PFD/1837671, 17/PFD/1994472, 17/PFU/1934277, 17/PFU/1990060, 17/PFD/1950364, 17/PU/1833063, 17/GOU_PU/1901387

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)