Skip to content
Altaica Urban
Granted

Boulevard du Souverain 23–25

Watermael-Boitsfort · 17/IPEPLP/1697174 · Prolongation de PE

Boulevard du Souverain 23–25, Watermael-Boitsfort: operation of installations. Case octroyé, lodged on 13 December 2018. The decision was notified on 23 December 2019, 375 days after lodging.

prolongation
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typeProlongation de PE
StatusOctroyé
Lodged on13 December 2018date the file was received
Decision notified23 December 2019375 days
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Declared incomplete
  3. Declared complete
  4. Decision notified · Granted

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
58 mPublic spaceConstruire un bassin d'orage sous la voirie de Ten Reuken et du parc Axa avec une capacité de 5.171m³.2022
58 mOtherModifier le permis existant du 04/08/2021 2021
58 mOtherPlacer des équipements intérieurs consistant en des installations décoratives et réversibles.2022
58 mHeavy renovationCréer un monte-charge entre le niveau sous-sol -2 et le niveau sous-sol -1.2023
58 mChange of useRégulariser l'aménagement extérieur et signalétique, mettre en place de nouveau panneaux de signalisation extérieur, mod2024

Other nearby cases : 17/PFU/1990850, 17/PFU/1933141, 17/PFU/1848909, 17/PU/2002370, 17/PFU/1846270, 17/PFD/2023287, 17/PFU/1918639, 17/PU/1922803, 17/PU/2020003, 17/PFU/2040831, 17/PFU/1993476, 17/PFU/1998123, 17/PFD/1929854, 17/PFD/1837671, 17/PFD/1994472, 17/PFU/1934277, 17/PFU/1990060, 17/PFD/1950364, 17/PU/1833063, 17/GOU_PU/1901387, 17/PU/1855207

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)