Boulevard du Souverain 23–25
Watermael-Boitsfort · 17/IPEPLP/1697174 · Prolongation de PE
Boulevard du Souverain 23–25, Watermael-Boitsfort: operation of installations. Case octroyé, lodged on 13 December 2018. The decision was notified on 23 December 2019, 375 days after lodging.
prolongation| Permit type | Prolongation de PE | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 13 December 2018 | date the file was received |
| Decision notified | 23 December 2019 | 375 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Declared incomplete
- Declared complete
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 58 m | Public space | Construire un bassin d'orage sous la voirie de Ten Reuken et du parc Axa avec une capacité de 5.171m³. | 2022 |
| 58 m | Other | Modifier le permis existant du 04/08/2021 | 2021 |
| 58 m | Other | Placer des équipements intérieurs consistant en des installations décoratives et réversibles. | 2022 |
| 58 m | Heavy renovation | Créer un monte-charge entre le niveau sous-sol -2 et le niveau sous-sol -1. | 2023 |
| 58 m | Change of use | Régulariser l'aménagement extérieur et signalétique, mettre en place de nouveau panneaux de signalisation extérieur, mod | 2024 |
Other nearby cases : 17/PFU/1990850, 17/PFU/1933141, 17/PFU/1848909, 17/PU/2002370, 17/PFU/1846270, 17/PFD/2023287, 17/PFU/1918639, 17/PU/1922803, 17/PU/2020003, 17/PFU/2040831, 17/PFU/1993476, 17/PFU/1998123, 17/PFD/1929854, 17/PFD/1837671, 17/PFD/1994472, 17/PFU/1934277, 17/PFU/1990060, 17/PFD/1950364, 17/PU/1833063, 17/GOU_PU/1901387, 17/PU/1855207
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)