Skip to content
Altaica Urban
Granted

Allée Christian de Duve 1–9

Woluwe-Saint-Lambert · 18/CL3/1732662 · Déclaration préalable Communal

Allée Christian de Duve 1–9, Woluwe-Saint-Lambert: operation of installations. Case octroyé, lodged on 9 August 2018.

Bouwwerf
The application's own description, in its source language (NL). Source: Nova.
Key figures
Permit typeDéclaration préalable Communal
StatusOctroyé
Lodged on9 August 2018date the file was received
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
38 mFaçade and windowsplacer des tentes solaires, des volets et des screens en façade avant de l'immeuble2025
38 mFaçade and windowsCLASSE SANS SUITE - placer des tentes solaires ou des screens en façades de l'immeuble2024
62 mNew constructionConstruire un immeuble de 83 logements et un parking de 64 places sur 2 niveaux en sous-sol, et aménager les abords2026
68 mHeavy renovationModifier le permis d'urbanisme 18/PFD/1723972, revoir certaines typologie d'appartement, intégrer des pompes à chaleur, 2026
141 mTree fellingAbattre 55 arbres (dont 21 morts sur pied) pour raisons phytosanitaires et sécurisation de 1 arbre au Parc du Val d'or.2024

Other nearby cases : 18/PFD/1825155, 18/GOU_PU/1894055, 18/PU/1908274, 18/PU/1979768, 18/PU/1826837, 18/SFD/1974495, 18/PU/1946135, 18/PU/1958961, 18/PU/1930111, 18/GOU_PU/1930658, 18/PFD/1911332, 18/PU/1961775, 18/GOU_PU/1842369

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)