Withdrawn
Avenue Hippocrate
Woluwe-Saint-Lambert · 18/IPE/554957 · Permis d'environnement
Avenue Hippocrate, Woluwe-Saint-Lambert: new construction. Case annulé, lodged on 11 December 2014. The decision was notified on 10 September 2015, 273 days after lodging.
Demande de construire et exploiter un immeuble de 7 niveaux comprenant des laboratoires, des animaleries, des bureaux, des cabinets de consultation médicale et une salle de séminaire (Tour LAENNEC)
pe de base 70102| Permit type | Permis d'environnement | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 11 December 2014 | date the file was received |
| Decision notified | 10 September 2015 | 273 days |
| Works started | 3 October 2016 | |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Declared incomplete
- Declared complete
- Decision notified · Withdrawn
- Works started
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)