Station STIB Crainhem
Woluwe-Saint-Lambert · 18/IPEDEC/1871648 · Déclaration préalable
Station STIB Crainhem, Woluwe-Saint-Lambert: operation of installations. Case octroyé, lodged on 16 December 2022.
BRKRU-40442B5_1, 02KRU, BX8362| Permit type | Déclaration préalable | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 16 December 2022 | date the file was received |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Declared complete
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 62 m | Public space | Installer des signalétiques directionnelles et de localisation tels que panneaux d'informations, totems, poteaux et marq | 2024 |
| 63 m | Signs and advertising | régulariser le placement d'une enseigne éclairée posée au sol sur le terrai bâti | 2026 |
| 181 m | Other | Les installations actuelles du poste Haute Tension (transformateurs, cabine 36kV, armoires basses tension) arrivent en f | 2025 |
| 181 m | Other | Remplacer les installations actuelles du poste Haute Tension (transformateurs, cabine 36 kV, armoires basses tensions) a | 2025 |
| 209 m | Roof | remplacer la toiture pyramidale par une toiture plate, modifier les enseignes et les façades du restaurant Quick | 2024 |
Other nearby cases : 18/PFD/1823853, 18/PU/1871605, 18/PU/1928088