Granted
Chemin de la Crète 96
Woluwe-Saint-Lambert · 18/IPEEXT/1976856 · Extension / Transformation de PE
Chemin de la Crète 96, Woluwe-Saint-Lambert: operation of installations. Case octroyé, lodged on 12 March 2025. The decision was notified on 9 April 2025, 28 days after lodging.
Mo n°16 : Déplacement du dépôt d'huiles usagées lié à l'unité de cogénération| Permit type | Extension / Transformation de PE | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 12 March 2025 | date the file was received |
| Decision notified | 9 April 2025 | 28 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 71 m | Other | Les installations actuelles du poste Haute Tension (transformateurs, cabine 36kV, armoires basses tension) arrivent en f | 2025 |
| 71 m | Other | Remplacer les installations actuelles du poste Haute Tension (transformateurs, cabine 36 kV, armoires basses tensions) a | 2025 |
| 106 m | Tree felling | Abattre 3 arbres | 2021 |
| 204 m | Signs and advertising | régulariser le placement d'une enseigne éclairée posée au sol sur le terrai bâti | 2026 |
| 205 m | Public space | Installer des signalétiques directionnelles et de localisation tels que panneaux d'informations, totems, poteaux et marq | 2024 |
Other nearby cases : 18/PU/1948707, 18/PU/1871605, 18/PU/1928088
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)