Granted
Chemin de la Crète 96
Woluwe-Saint-Lambert · 18/IPEEXT/2013012 · Extension / Transformation de PE
Chemin de la Crète 96, Woluwe-Saint-Lambert: demolition and reconstruction. Case octroyé, lodged on 10 December 2025. The decision was notified on 5 January 2026, 26 days after lodging.
modification du poste, avec suppression et ajout d’équipements techniques (ajout d'un groupe électrogène, remplacement de transformateurs statiques et de batteries) ainsi que destruction et construction d’un bâtiment.| Permit type | Extension / Transformation de PE | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 10 December 2025 | date the file was received |
| Decision notified | 5 January 2026 | 26 days |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 2 m | Other | Les installations actuelles du poste Haute Tension (transformateurs, cabine 36kV, armoires basses tension) arrivent en f | 2025 |
| 2 m | Other | Remplacer les installations actuelles du poste Haute Tension (transformateurs, cabine 36 kV, armoires basses tensions) a | 2025 |
| 63 m | Tree felling | Abattre 3 arbres | 2021 |
| 141 m | Signs and advertising | régulariser le placement d'une enseigne éclairée posée au sol sur le terrai bâti | 2026 |
| 141 m | Public space | Installer des signalétiques directionnelles et de localisation tels que panneaux d'informations, totems, poteaux et marq | 2024 |
Other nearby cases : 18/PU/1948707, 18/PU/1928088, 18/PU/1871605
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)