Chaussée de Louvain 1150–1170

Woluwe-Saint-Lambert · 18/IPEPLP/1842499 · Prolongation de PE

Chaussée de Louvain 1150–1170, Woluwe-Saint-Lambert: operation of installations. Case octroyé, lodged on 17 May 2022. The decision was notified on 31 March 2023, 318 days after lodging.

Exploitation de dépôts de véhicules neufs et usagés destinés à la vente et d’un garage d’entretien
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typeProlongation de PE
StatusOctroyé
Lodged on17 May 2022date the file was received
Decision notified31 March 2023318 days
Works started20 May 2023
Floor areasnot applicable to this type of case

Timeline

  1. Application lodged
  2. Declared incomplete
  3. Declared complete
  4. Decision notified · Granted
  5. Works started

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
8 mTree fellingabattre 19 arbres2025
102 mHeavy renovationrevoir le système de production de chaleur et d’eau chaude sanitaire, réaménager le sous-sol et les locaux techniques, m2024
111 mNew constructionplacer une installation fixe temporaire à usage commercial destinée à accueillir un bureau de vente des logements du pro2024
136 mHeavy renovationModifier le permis référencé 18/PFD/1697881, modifier les gabarits, adapter les techniques en toiture, modifier l'esthét2023
151 mFaçade and windowsisoler et enduire la façade avant et le mur pignon et régulariser le remplacement des portes et des châssis de la maison2023

Other nearby cases : 18/PU/1945181, 18/AA/1830292, 18/PU/1904574, 18/PU/2022302, 18/PU/1981251, 18/PU/1851392, 18/PU/1836467, 18/PU/1961537, 06/SFD/1822746, 06/SFD/1821710

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)