Withdrawn
Chaussée de Stockel 99
Woluwe-Saint-Lambert · 18/PFD/2015921 · Permis d'urbanisme délivré par le FD
Chaussée de Stockel 99, Woluwe-Saint-Lambert: new construction. Case annulé, lodged on 9 January 2026. The project creates 680 m² of housing. It comprises 6 dwellings.
Construire un immeuble de 5 appartements et 1 studio.680m²
Housing floor area created
6
Dwellings created
| Permit type | Permis d'urbanisme délivré par le FD | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 9 January 2026 | date the file was received |
| Competent authority | BUP |
Timeline
- Application lodged
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 0 m | New construction | construire un immeuble de 6 logements et 6 emplacements de parking pour voitures et abattre 9 arbres sur le terrain | 2026 |
| 65 m | Extension or raising | modifier le permis d'urbanisme n° PU/1832654/2022 (correction de la profondeur de l'extension par rapport aux profils mi | 2023 |
| 65 m | Extension or raising | construire deux lucarnes, étendre le sous-sol et le rez-de-chaussée et régulariser les modifications apportées à la mais | 2022 |
| 93 m | Extension or raising | Rénover et etendre le Pavillon existant. Implantation d'un bloc sanitaire extérieur. | 2026 |
| 95 m | Public space | Déplacer la zone pour chiens en liberté et réhabiliter le sous-bois dans la zone laissée libre | 2021 |
Other nearby cases : 18/PU/1898306, 18/PU/1898720, 18/PFD/1799210, 18/PU/1995827, 18/PU/1988652, 18/PFD/1799100
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)