Skip to content
Altaica Urban
Withdrawn

Chaussée de Stockel 99

Woluwe-Saint-Lambert · 18/PFD/2015921 · Permis d'urbanisme délivré par le FD

Chaussée de Stockel 99, Woluwe-Saint-Lambert: new construction. Case annulé, lodged on 9 January 2026. The project creates 680 m² of housing. It comprises 6 dwellings.

Construire un immeuble de 5 appartements et 1 studio.
The application's own description, in its source language (FR). Source: Nova.
680m²
Housing floor area created
6
Dwellings created
Key figures
Permit typePermis d'urbanisme délivré par le FD
StatusAnnulé
Lodged on9 January 2026date the file was received
Competent authorityBUP

Timeline

  1. Application lodged

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
0 mNew constructionconstruire un immeuble de 6 logements et 6 emplacements de parking pour voitures et abattre 9 arbres sur le terrain2026
65 mExtension or raisingconstruire deux lucarnes, étendre le sous-sol et le rez-de-chaussée et régulariser les modifications apportées à la mais2022
65 mExtension or raisingmodifier le permis d'urbanisme n° PU/1832654/2022 (correction de la profondeur de l'extension par rapport aux profils mi2023
93 mExtension or raisingRénover et étendre le Châlet Malou et implanter un bloc sanitaire extérieur.2026
94 mFaçade and windowsRenouvellement du perron d'entrée2026

Other nearby cases : 18/PFD/1821311, 18/PU/1898306, 18/PU/1898720, 18/PU/1995827, 18/PU/1988652

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)