Jardin Martin V 42, Woluwe-Saint-Lambert: tree felling. Case octroyé, lodged on 19 August 2025. The decision was notified on 4 September 2025, 16 days after lodging.
Demande de permis pour abattre un arbre mort et plantation de nouveaux arbres| Permit type | Permis d'urbanisme unique délivré par le FD | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 19 August 2025 | date the file was received |
| Decision notified | 4 September 2025 | 16 days |
| Floor areas | — | not reported by the source |
| Competent authority | BUP |
Timeline
- Application lodged
- Declared complete
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 41 m | Change of use | changer l'affectation d'un local semi-enterré de cave en commerce alimentaire BIO de proximité et mettre en place des en | 2023 |
| 75 m | Signs and advertising | Placer, déplacer, adapter, régulariser des caméras de surveillance du site Proposer un modèl unique pour l'ensemble du | 2021 |
| 131 m | Split into dwellings | régulariser un appartement d'une chambre au troisième étage et les modifications effectuées sur les terrasses et façades | 2025 |
| 134 m | Retail or horeca fit-out | régulariser la modification de l'utilisation de trois commerces en restaurants (HORECA), les modifications structurelles | 2021 |
| 158 m | Heavy renovation | modifier le permis 18/PFD/1753988 concernant la mise en place d’un learning center de l’UCL, placer des garde-corps fixe | 2023 |
Other nearby cases : 18/PU/2042219, 18/PFD/2006670, 18/PFD/1866911, 18/AA/1856882