Granted
Boulevard du Souverain 275BIS
Woluwe-Saint-Pierre · 19/PFU/1834912 · Permis d'urbanisme unique délivré par le FD
Boulevard du Souverain 275BIS, Woluwe-Saint-Pierre: tree felling. Case octroyé, lodged on 16 March 2022. The decision was notified on 22 March 2022, 6 days after lodging.
Mettre en place une clôture basse en bois au bord du grand étang Mellaerts et une ligne de flotteurs| Permit type | Permis d'urbanisme unique délivré par le FD | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 16 March 2022 | date the file was received |
| Decision notified | 22 March 2022 | 6 days |
| Works started | 28 March 2023 | |
| Floor areas | — | not reported by the source |
| Competent authority | BUP |
Timeline
- Application lodged
- Declared complete
- Decision notified · Granted
- Works started
- event_works_ended
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 89 m | Extension or raising | étendre et aménager l’habitation unifamiliale 4 façades | 2023 |
| 149 m | Tree felling | Abattre 11 arbres le long des berges de Woluwe, dans un but de sécurisation et d’entretien ordinaire du cours d’eau | 2024 |
| 151 m | Public space | Remplacer la structure (passerelle) actuelle en mauvais état par une structure plus récente mais de même dimension, pour | 2023 |
| 179 m | Tree felling | Abattre 14 arbres et réaliser une sécurisation par réduction pour des raisons phytosanitaires. | 2025 |
| 198 m | Tree felling | mettre en conformité de l’abattage d’un pin et replanter 6 arbres | 2024 |
Other nearby cases : 19/PFU/1927307, 19/PFU/1949999
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)