Granted
Boulevard Industriel 133
Anderlecht · C_PLP/584688 · Prolongation de PE Communal
Boulevard Industriel 133, Anderlecht: operation of installations. Case octroyé, lodged on 21 October 2015. The decision was notified on 27 January 2016, 98 days after lodging.
continuer à exploiter un dépôt de produits de la mer| Permit type | Prolongation de PE Communal | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 21 October 2015 | date the file was received |
| Decision notified | 27 January 2016 | 98 days |
| Works started | 23 October 2016 | |
| Floor areas | — | not applicable to this type of case |
Timeline
- Application lodged
- Declared incomplete
- Declared complete
- Decision notified · Granted
- Works started
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 64 m | Extension or raising | construire une extension d'un entrepôt | 2022 |
| 108 m | New construction | construire un hall industriel et des locaux d'activités productives | 2024 |
| 128 m | Signs and advertising | Installer un dispositif publicitaire digital de 2 m² (MU783) à hauteur du n°122 boulevard Industriel | 2023 |
| 140 m | Heavy renovation | transformer sans changement de volume le permis d'urbanisme 48388 (extension des WC Dames et mezzanine au rez-de-chaussé | 2023 |
| 165 m | Signs and advertising | Maintenir un panneau publicitaire non éclairé de 20 m², situé sur un talus à proximité du boulevard Industriel 116. | 2024 |
Other nearby cases : 01/PU/1908338, 01/PU/1899884, 01/PU/1827452
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)