Skip to content
Altaica Urban
Granted

Avenue de l'Arbre Ballon 113–117

Bruxelles · C_PLP/656601 · Prolongation de PE Communal

Avenue de l'Arbre Ballon 113–117, Bruxelles: operation of installations. Case octroyé, lodged on 13 November 2017.

Prolongation du permis A87/2003 - Parking couvert et installation de chauffage
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typeProlongation de PE Communal
StatusOctroyé
Lodged on13 November 2017date the file was received
Floor areasnot applicable to this type of case

Timeline

  1. Declared incomplete
  2. Application lodged

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
72 mNew constructionconstruire un immeuble de logements d'un gabarit R+2+T (2 niveaux) rue Profonde et R+3+T (3 niveaux) rue du Rubis compre2025
72 mNew constructionconstruire un immeuble de logements d'un gabarit R+2+T (2 niveaux) rue Profonde et R+3+T (3 niveaux) rue du Rubis compre2026
108 mExtension or raisingd'une part, aménager un studio en lieu et place des locaux communs du rez-de-chaussée (mise en conformité) et d'autre pa2022
108 mExtension or raisingd'une part, aménager un studio en lieu et place des locaux communs du rez-de-chaussée (mise en conformité) et d'autre pa2023
109 mSplit into dwellingstransformer un petit immeuble existant avec modification du nombre et de la répartition des logements, soit 4 logements 2025

Other nearby cases : 04/PU/1828964, 10/PU/1827474, 10/PU/2029824, 10/PFD/1832598, 10/PFD/2005397, 10/PU/1895836, 04/PU/2029165, 04/PU/1972877, 10/PU/1845727, 10/PU/1951378, 10/PU/1902594, 10/PU/1830088, 10/PU/2031165, 10/PU/1869879, 10/PU/1831123, 10/PU/2040457, 04/PU/1977473, 10/PFD/1840306

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)