Boulevard de l'Humanité 124

Forest · PU/267411 · Permis d'urbanisme privé

Boulevard de l'Humanité 124, Forest: new construction. Case octroyé, lodged on 22 December 1995. The decision was notified on 29 August 1996, 251 days after lodging.

construction d'un hangar (centre de tri) et d'un bâtiment administratif
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typePermis d'urbanisme privé
StatusOctroyé
Lodged on22 December 1995date the file was received
Public inquiry17 March 1996 – 18 March 1996
Consultation committee26 March 1996
Decision notified29 August 1996251 days
Floor areasnot reported by the source
Competent authorityForest

Timeline

  1. Application lodged
  2. Public inquiry opened
  3. Public inquiry closed
  4. Consultation committee
  5. Decision notified · Granted

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
83 mSigns and advertisingInstaller un dispositif publicitaire digital de 2 m² (MU783) à hauteur du n°122 boulevard Industriel 2023
88 mSigns and advertisingMaintenir un panneau publicitaire non éclairé de 20 m², situé sur un talus à proximité du boulevard Industriel 116.2024
186 mSigns and advertisingmaintenir un dispositif publicitaire de 15m²2025
192 mChange of usechanger l'affectation d'un centre de véhicules d'occasion en entrepôt avec show-room2023
211 mSigns and advertisingmaintenir un dispoisitif publicitaire de 36 m²2025

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)