Boulevard Industriel 21

Anderlecht · PU/334296 · Permis d'urbanisme privé

Boulevard Industriel 21, Anderlecht: public space. Case refusé, lodged on 7 November 2005. The decision was notified on 18 April 2006, 162 days after lodging.

placer un mobilier urbain de 2 m² (40.378)
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typePermis d'urbanisme privé
StatusRefusé
Lodged on7 November 2005date the file was received
Decision notified18 April 2006162 days
Floor areasnot reported by the source
Competent authorityAnderlecht

Timeline

  1. Application lodged
  2. Decision notified · Refused

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
200 mDemolitionDémolir deux gazomètres sphériques jusqu'au niveau du sol2022
249 mDemolition and reconstructionDémolir un immeuble de bureau désaffecté (R+5) et construire un bâtiment comprenant un showroom au rez-de-chaussée et de2022
249 mDemolition and reconstructionDémolir la tour de bureaux désaffecté R+5 et construire une surface de show-room (commerce de gros en matériel sanitaire2023
249 mDemolition and reconstructionDémolir une tour de bureaux désaffecté R+5, construire un show-room (commerce spécialisé en matériel sanitaire) au rez-d2024

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)