Withdrawn
Boulevard Industriel 30
Anderlecht · PU/335114 · Permis d'urbanisme privé
Boulevard Industriel 30, Anderlecht: heavy renovation. Case annulé, lodged on 15 November 2007. The decision was notified on 6 May 2008, 173 days after lodging.
modification de l'entrée et réaménagement intérieur de l'immeuble| Permit type | Permis d'urbanisme privé | |
|---|---|---|
| Status | Annulé | |
| Lodged on | 15 November 2007 | date the file was received |
| Public inquiry | 16 January 2008 – 31 January 2008 | |
| Consultation committee | 13 February 2008 | |
| Decision notified | 6 May 2008 | 173 days |
| Floor areas | — | not reported by the source |
| Competent authority | Anderlecht |
Timeline
- Application lodged
- Declared incomplete
- Declared complete
- Public inquiry opened
- Public inquiry closed
- Consultation committee
- Decision notified · Withdrawn
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 0 m | Demolition and reconstruction | Démolir un immeuble de bureau désaffecté (R+5) et construire un bâtiment comprenant un showroom au rez-de-chaussée et de | 2022 |
| 0 m | Demolition and reconstruction | Démolir une tour de bureaux désaffecté R+5, construire un show-room (commerce spécialisé en matériel sanitaire) au rez-d | 2024 |
| 0 m | Demolition and reconstruction | Démolir la tour de bureaux désaffecté R+5 et construire une surface de show-room (commerce de gros en matériel sanitaire | 2023 |
| 162 m | Tree felling | abattre 68 arbres le long des berges de la Senne | 2021 |
| 189 m | Change of use | changer l'affectation d'espaces de bureaux en espace de stockage (maintien d'un espace bureaux au rez-de-chaussée) | 2025 |
Other nearby cases : 01/PU/1820250, 01/PU/2033060, 01/PU/1850168, 01/GOU_PU/1916777, 01/PU/1958917
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)