Granted
Boulevard Paepsem 7
Anderlecht · PU/335863 · Permis d'urbanisme privé
Boulevard Paepsem 7, Anderlecht: extension or raising. Case octroyé, lodged on 20 July 2009. The decision was notified on 18 May 2010, 302 days after lodging.
Construire ou transformer avec modification du volume.| Permit type | Permis d'urbanisme privé | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 20 July 2009 | date the file was received |
| Decision notified | 18 May 2010 | 302 days |
| Floor areas | — | not reported by the source |
| Competent authority | Anderlecht |
Timeline
- Application lodged
- Decision notified · Granted
- Declared incomplete
- Declared complete
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 148 m | Change of use | changer l'affectation d'espaces de bureaux en espace de stockage (maintien d'un espace bureaux au rez-de-chaussée) | 2025 |
| 157 m | Signs and advertising | maintenir un dispositif publicitaire digital double face de 6m² | 2026 |
| 182 m | Demolition and reconstruction | Démolir une tour de bureaux désaffecté R+5, construire un show-room (commerce spécialisé en matériel sanitaire) au rez-d | 2024 |
| 182 m | Demolition and reconstruction | Démolir la tour de bureaux désaffecté R+5 et construire une surface de show-room (commerce de gros en matériel sanitaire | 2023 |
| 182 m | Demolition and reconstruction | Démolir un immeuble de bureau désaffecté (R+5) et construire un bâtiment comprenant un showroom au rez-de-chaussée et de | 2022 |
Other nearby cases : 01/PU/1820250, 01/PU/1958917, 01/GOU_PU/1902377, 01/PU/1850168, 01/PU/1857813, 01/GOU_PU/1916777, 01/PFD/1821638
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)