Refused

Boulevard International 11

Anderlecht · PU/335969 · Permis d'urbanisme privé

Boulevard International 11, Anderlecht: energy works. Case refusé, lodged on 4 December 2009. The decision was notified on 2 February 2010, 60 days after lodging.

installer des panneaux photovoltaïques sur la toiture
The application's own description, in its source language (FR). Source: Nova.
Key figures
Permit typePermis d'urbanisme privé
StatusRefusé
Lodged on4 December 2009date the file was received
Decision notified2 February 201060 days
Floor areasnot reported by the source
Competent authorityAnderlecht

Timeline

  1. Application lodged
  2. Decision notified · Refused

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Nearby permits

Planning permit cases within 250 metres, last five years.
DistanceWork typeObjectDate
0 mEnergy worksposer des installations techniques pour la recharge de voitures électriques2022
0 mEnergy worksplacer des installations techniques pour la recharge de voitures électriques2023
127 mNew constructionconstruire un hall industriel et des locaux d'activités productives2024
136 mHeavy renovationtransformer sans changement de volume le permis d'urbanisme 48388 (extension des WC Dames et mezzanine au rez-de-chaussé2023
167 mExtension or raisingconstruire une extension d'un entrepôt2022

Other nearby cases : 01/PFD/1952064, 01/PU/1938453

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)