Skip to content
AltUrb
Granted

Rue Bodeghem 84–92

Bruxelles · PU/519092 · Permis d'urbanisme privé

Rue Bodeghem 84–92, Bruxelles: heavy renovation. Case octroyé, lodged on 6 September 2006. The decision was notified on 23 April 2008, 595 days after lodging. It comprises 18 dwellings.

Transformation avec diminution de volume de 3 immeubles (comprenant 7 logements, 1 salle de fête, 1 commerce et des entrepôts) en18 logements et un parking de 8 places au rez-de-chaussée.
The application's own description, in its source language (FR). Source: Nova.
18
Dwellings created
Key figures
Permit typePermis d'urbanisme privé
StatusOctroyé
Lodged on6 September 2006date the file was received
Public inquiry11 May 2007 – 26 May 2007
Consultation committee3 July 2007
Decision notified23 April 2008595 days
Floor areasnot reported by the source
Competent authorityBruxelles

Timeline

  1. Application lodged
  2. Public inquiry opened
  3. Declared complete
  4. Public inquiry closed
  5. Consultation committee
  6. Decision notified · Granted

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)