Granted
Chaussée de Vilvorde 214
Bruxelles · PU/524790 · Permis d'urbanisme privé
Chaussée de Vilvorde 214, Bruxelles: operation of installations. Case octroyé, lodged on 3 October 2012. The decision was notified on 24 May 2013, 233 days after lodging.
plaatsen van een blusschuimtank van 4.500 liter in een inkuiping en plaatsen van een additieftank van 16.000 liter in een inkuiping GEMENGD DOSSIER (ref. M.V. 003V/2013)| Permit type | Permis d'urbanisme privé | |
|---|---|---|
| Status | Octroyé | |
| Lodged on | 3 October 2012 | date the file was received |
| Public inquiry | 25 January 2013 – 9 February 2013 | |
| Consultation committee | 19 February 2013 | |
| Decision notified | 24 May 2013 | 233 days |
| Floor areas | — | not reported by the source |
| Competent authority | Bruxelles |
Timeline
- Application lodged
- Declared complete
- Public inquiry opened
- Public inquiry closed
- Consultation committee
- Decision notified · Granted
These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.
Nearby permits
| Distance | Work type | Object | Date |
|---|---|---|---|
| 72 m | Energy works | Réaliser des travaux éléctriques et de génie civil dans l'enceinte du poste haute tension de Marly Placer des nouveaux | 2021 |
| 242 m | Extension or raising | d’une part, réaménager un centre de données, modifier les façades, rehausser le local technique, agrandir l’abri à vélos | 2025 |
| 242 m | Tree felling | abattre 30 arbres à haute tige en vue de construire un datacenter (permis A387/2019 et A536/2020) | 2024 |
Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)