Skip to content
AltUrb
Granted

Rue Terre-Neuve 80–84

Bruxelles · PU/525672 · Permis d'urbanisme privé

Rue Terre-Neuve 80–84, Bruxelles: split into dwellings. Case octroyé, lodged on 15 May 2013. The decision was notified on 21 May 2014, 371 days after lodging. It comprises 3 dwellings.

diviser le commerce existant en 3 commerces, modifier la division des logements existants en 3 logements (1 app. 1 ch., 1 app. 2 ch., 1app. 3 ch.), aménager 2 terrasses côté rue des Ursulines et rue de la Roue, installer des gaines et machines techniques entourées de grilles métalliques sur la toiture plate de l'immeuble
The application's own description, in its source language (FR). Source: Nova.
3
Dwellings created
Key figures
Permit typePermis d'urbanisme privé
StatusOctroyé
Lodged on15 May 2013date the file was received
Public inquiry20 September 2013 – 5 October 2013
Consultation committee15 October 2013
Decision notified21 May 2014371 days
Floor areasnot reported by the source
Competent authorityBruxelles

Timeline

  1. Application lodged
  2. Declared incomplete
  3. Declared complete
  4. Public inquiry opened
  5. Public inquiry closed
  6. Consultation committee
  7. Decision notified · Granted

These dates come from the source record. Altaica Urban has been following this permit since 11 September 2026.

Source: Région de Bruxelles-Capitale – Nova (urban.brussels, Bruxelles Environnement, communes)